翻訳と辞書
Words near each other
・ Cooroy, Queensland
・ Coorparoo Fire Station
・ Coorparoo Football Club
・ Coorparoo railway station
・ Coorparoo School of Arts and RSL Memorial Hall
・ Coorparoo Substation No. 210
・ Coorparoo, Queensland
・ Coors
・ Coors 200
・ Coors 420
・ Coors Amphitheatre
・ Coors Brewers
・ Coors Brewing Company
・ Coors Classic
・ Coors Cutter
Coors Events Center
・ Coors Field
・ Coors Light
・ Coors Light Cash Spiel
・ Coors Light Pole Award
・ CoorsTek
・ Coos
・ Coos Art Museum
・ Coos Bay
・ Coos Bay (disambiguation)
・ Coos Bay Mosquito Fleet
・ Coos Bay Public Schools
・ Coos Bay Rail Link
・ Coos Bay Wagon Road
・ Coos Bay Wagon Road Lands


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Coors Events Center : ウィキペディア英語版
Coors Events Center
in dollars)
| architect = Sink Combs Dethlefs
| structural engineer = John A. Martin & Associates〔(【引用サイトリンク】url=http://www.jamanv.com/projects/entertainment/ )
| former_names = Coors Events/Conference Center (1990-2008); CU Events/Conference Center (1979–1990)
| tenants = Colorado Buffaloes
(Basketball & Volleyball)
| seating_capacity = 11,064
}}
The Coors Events Center is an 11,064-seat multi-purpose arena on the Boulder main campus of the University of Colorado. It opened in 1979, and is home to the Colorado Buffaloes men's and women's basketball teams and the volleyball team.
It was formerly called the CU Events/Conference Center and was renamed to the Coors Events/Conference Center in September 1990 after the Coors family in recognition of a $5 million gift from the Adolph Coors Foundation.〔("Coors Events Center History" ) 〕 In 2008 with the addition of the basketball offices to the building on the service level, the "Conference" was removed from the name as there were no longer conference rooms in the building.
The building is an eight-sided concrete structure, with three levels. The arena floor, the service level and the concourse level. 〔 The building is single-tiered inside. It replaced the Balch Fieldhouse, the current home of the indoor track and field team located directly adjacent to Folsom Field.
==Improvements==
The most dramatic changes since the building has been opened have come since 2008. After the 2007-08 basketball seasons, the CEC underwent a $200,000 "Floor Lift" with a permanent maple surface was installed that has technology to reduce injuries and fatigue. 〔
In April 2008, the men's and women's basketball offices were relocated to the CEC from Folsom Field second level where the conference rooms were previously located.
In the summer of 2010, two new video boards were installed in the southwest and northeast corners. With the new video boards and as part of the new practice facility, a new state-of-the-art production facility was built for the department's award-winning BuffVision office. The production room controls the video boards at both the Coors Events Center and Folsom Field.
A new 44,000-square foot practice facility was opened in August 2011 for volleyball and basketball. The building was just the second athletic facility in the nation and third on CU's campus to earn LEED Platinum Certification, the highest possible by the internationally recognized system developed by the U.S. Green Building Council.〔
In August 2013, a video room for the men's and women's basketball teams was opened for the first time, giving both teams additional meeting space and the ability to watch film more efficiently.
In February 2014, a new weight room was finished in the remaining space on the second level where the conference rooms were once located, adjacent to the basketball offices that were relocated in 2008.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Coors Events Center」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.